Context

ADR-0007 gives every Job a worktree and a branch and explicitly leaves their cleanup undecided. Worktrees share the object store but each holds a full set of working files, so a week of finished Jobs is a week of checkouts sitting on disk.

There is also a second, messier population: worktrees whose Job no longer matches them. A daemon killed mid-Run, a Job deleted from the database, a directory removed by hand, a git worktree admin entry pointing at nothing. Nothing in the Job lifecycle cleans those up, because by definition they have fallen out of it.

Decision

Disposal is explicit

A Job that passes Verification enters review, not done. From there:

  • owl jobs accept <id> - removes the worktree, keeps the branch, Job becomes done
  • owl jobs drop <id> - removes the worktree and deletes the branch, Job becomes cancelled

Owl additionally treats “branch merged into the Project’s base branch” as an implicit accept, so merging through normal git tooling cleans up without a second step.

Owl never pushes a branch anywhere. Everything stays local in the MVP.

Garbage collection

The daemon runs a periodic garbage collection task - plain Go, no Agent involved - on start and on an interval, also invokable as owl gc. It:

  • reconciles worktrees on disk against Jobs in the database, removing those whose Job is gone, cancelled, or already done
  • clears the stale admin entries of Owl’s own worktrees per Project - those under the Project’s worktree directory (ADR-0014) whose directory is gone - and only those. A worktree the user made elsewhere is never pruned, even when its directory is missing: it may be on a volume that is not mounted right now, and is not Owl’s to forget. Disposing of a Job whose worktree is already gone clears that Job’s entry the same way, and no other.
  • surfaces, rather than deletes, anything that looks like unfinished work: a worktree with uncommitted changes, a Job stuck in review beyond a threshold, a Job left active by a daemon that died

Unfinished work is reported through owl status and shown in the desktop app.

Consequences

  • The morning review has an actual verb, and owl status can always answer “what is waiting for me”.
  • Disk stays bounded without a timer that deletes things out from under the user mid-review.
  • Garbage collection never destroys uncommitted work silently. Deleting a worktree that has changes in it requires the user to say so - the point of the task is to report as much as to reclaim.
  • The desktop app gains a surface for “you have three Jobs waiting and one worktree with stray changes”. This is not a notification in the system sense; ADR-scope still excludes those for the MVP.
  • review is a fifth Job state. ADR-0025 later adds exhausted; the full set is pending, active, blocked, review, done, cancelled, exhausted.
  • Merge detection needs a per-Project poll against the base branch, which is cheap but is a scheduled task the daemon did not otherwise need.

Alternatives considered

Let git decide, with no verbs. Owl removes a worktree once its branch merges and does nothing else. Elegant, and the user’s normal workflow is the whole interface. Rejected because rejection is inexpressible: a branch reviewed and declined looks exactly like one never opened, so those worktrees live forever and Owl can never state what is genuinely outstanding.

Time-based cleanup. Remove worktrees N days after completion. Bounded disk for zero ceremony, but a worktree can vanish mid-review, which is surprising in the worst way the first time it happens.